Badamihighways

PROJECT :

Access Controlled Highway of 4 lane with Paved Shoulders from Design Ch. 89+900 to Design Ch.136+100 in Belgaum – Hungund – Raichur Section of NH748A in State of Karnataka on HAM Under NH(O) (Project Length – 46.200 Kms) (Package-3)

Badami Highways Private Limited (BHPL or the Concessionaire) is a special purpose vehicle company promoted jointly by BEKEM Infra Projects Private Limited (BIPPL)  and DHD Infracon Private Limited (DHDIPL) to undertake development, maintenance and management of Access Controlled Highway of 4 lane with Paved Shoulders from Design Ch. 89+900 to Design Ch. 136+100 in Belgaum – Hungund – Raichur Section of NH748A in State of Karnataka on HAM Under NH(O) (Project Length – 46.200 Kms) (Package-3)

The Project highway comprises section of NH-748A starting at Km.89.100 near Batkurki Village and ending at Km. 136.100 near Guledagudda Village, passing through Shirasapur, Chinchalkatti LT, konkanakappa, and Teggi which fall in Bagalkot & Raichur district, in the State of Karnataka. with approximate design length of 46.200 km.

Project Details

Particulars

Details

Project Name

Access Controlled Highway of 4 lane with Paved Shoulders from Design Ch. 89+900 to Design Ch.136+100 in Belgaum – Hungund – Raichur Section of NH748A in State of Karnataka on HAM Under NH(O) (Project Length – 46.200 Kms) (Package-3)

Design length

46.200 Km

PPP Mode

Hybrid Annuity Mode

Concession Authority

National Highways Authority of India

Concessionaire

M/s Badami Highways Private Limited

Concession Period

17 years from Appointed Date including construction period

Construction period

2 Years i.e., 730 days

EPC Contractor

Bekem Infra Projects Private Limited

Key Dates

Bid Due Date

21St February 2024

Bid award date (LOA Date)

9th March 2024

Execution of Concession Agreement

28th June 2024

Financial Closure

28th November 2024

Appointed Date (AD)

4th April 2025

Construction starts date (Envisaged)

4th April 2025

Commercial Operation Date (COD)

4th April 2027

Concession End Date

4th April 2042

Authority

National Highways Authority of India

Sponsor

(EPC Contractor)

M/s. BEKEM Infra Projects Private Limited,

# Plot No.289, Avenue-1 Road No.06,

Kakatiya Hills, Madhapur, Hyderabad -500081

Project Company (Concessionaire)

M/s Badami Highways Private Limited

3rd Floor, Plot No.289, Sarojini Naidu Nagar, Madhapur, Shaikpet, Hyderabad, Telangana, India- 500081

Major Scope of the Project:

 

Description

Unit

Scope

Road Length

kms

46.2

Major bridge

Nos

3

Minor bridge

Nos

19

ROB

Nos

1

Utility structure

Nos

1

LVUP

Nos

11

VUP

Nos

4

VOP

Nos

Interchange

Nos

Box Culverts

Nos

143

Culverts on crossroads

Nos

15

Construction Progress as of October -2025

Description

Physical / Financial %

Scheduled Physical Progress Current Month (%)

3.25%

Cum. Scheduled Physical Progress up to Current month (%)

26.76%

Actual Physical Progress Current month (%)

0.96%

Cum. Actual Physical Progress Current month (%)

5.47%

**** Progress was affected due to Land issues raised by the local formers

 

 

Physical Progress as of October -2025

Sl.No

Description

Unit

Scope

Completed Length/Nos

% of Progress wrt scope

1

Clearing & Grubbing

km

92.4

26.78

28.98%

2

Embankment

km

90.59

9.784

10.80%

3

Sub Grade

km

90.59

9.170

10.12%

4

CTSB

km

90.59

5

WMM

km

90.59

7

DBM

km

90.59

8

BC

km

92.4

9

Box Culverts

Nos

153

20

13.07%

10

Minor/Major Bridges

Nos

22

1

4.55%

11

ROB

Nos

1

12

Grade Separated Structures

Nos

15

3

20.0%

13

RE wall Block Casting

Sqm

81,140

13,100

16.14%

14

RE wall Block Erection

Sqm

81,140

15

Boundary Wall Erection

Km

50.24

16

Boundary Wall Erection

Km

50.24

17

HT/ LT crossings.

Nos

49

32

65.30%

18

EHT Crossings

Nos

3

 

Access Controlled Highway of 4 Lane with Paved Shoulders from Design Ch.89.900 to Design Ch.136.100 in Belgaum – Hungund – Raichur Section of NH748A in the State of Karnataka on Hybrid Annuity Mode under NH (O) (Project Length – 46.200Kms) (Package-3)

TBT Training Conducted to Workers

Soil Investigation is in progress for Ch 132+000 MJB in the Presence of IE Representative’s

Crusher setup is in progress at Ch. 93+650

RE Blocks casting yard at Ch.112+400 Base Camp

Clearing & Grubbing is in progress from Ch 111+470 to Ch 111+660

Site Visit of NHAI and IE Representatives

Precast Box Culverts curing in progress at Ch 112+400 casting yard

PCC Laying in Progress at Ch 108+560 LVUP RHS Precast Box Culverts Shuttering works in progress at Ch 112+400 casting yard

Shuttering and Reinforcement Checking by IE representatives at Ch 108+560 LVUP RHS

Cleaning and Grubbing in Progress at Ch 90+000 to 90+150

Cleaning and Grubbing in Progress at Ch 90+000 to 90+150

Raft Reinforcement Checking with IE Representatives at Ch. 108+560 LVUP on RHS

Ch 108+560 LVUP RHS Raft Concrete Pouring in Progress

Ch 93+500 to 93+650 BHS C&G Work Inprogress

Ch 96+700 to 96+900 BHS C&G Work Inprogress

109+700 to 109+800 BHS EMB TOP Work Inprogress

Ch 108+560 LVUP (LHS) Top Slab Concrete Inprogres

Ch 97+492 Reinforcement Binding InProgress

Tree Counting conducted with Forest Department

LA Clearance with police Protection

Ch 93+500 MNB Site Visit by KNNL Executive Engineer (EE) , Assistant Executive Engineer (AEE)

Bearings and Prestressing Materials Factory Visit Conducted by NHAI and IE Representatives

Ch 93+662 Raft Concrete and reinforce Checking with IE Representatives

Girder Reinforcement and Steel Checking in progress With IE Representatives

Precast Box Culverts Curing Inprogress

Precast Box Culverts Casting Inprogress

Ch 96+200 to 96+500 C&G In Progress

Ch 96+050 to 96+200 Embankment Rolling and Grading in progress

Ch 90+400 to 90+900 Embankment Top Layer

Ch 99+000 to 90+200 Subgrade Top Layer

FDD Checking With IE Representatives

Utility Ducts Laying in Progress

Ch:111+800 LT/HT Lines Crossings